BBL pipeline inspection program September 2023

10 August 2023

As announced in May 2023, BBL Company’s annual planned maintenance period of the BBL facilities will take place during 6 gas days starting from Tuesday 5 September 2023 at 06:00 CEST and ending at Monday 11 September at 06.00 CEST.

Following this annual planned maintenance period, an internal pipeline cleaning and inspection program will be conducted. This inspection program is an essential activity for maintaining pipeline integrity and future gas transportation services.

This inspection program will start on Monday 11 September at 06.00 CEST and is planned to be completed by Monday 25 September at 06.00 CEST. During the inspection program, pipeline cleaning and inspection gauges are sent through the BBL pipeline whilst the pipeline is under normal physical reverse flow conditions (GB > NL).

Availability Reverse Flow (GB to NL) capacity during the inspection program

During the inspection program, the physical Reverse Flow capacity of the BBL pipeline will be technically maximized at 7.0 GWh/h for both the Day Ahead auctions as well as the upcoming monthly auction of September 2023.

Availability Forward Flow (NL to GB) capacity during the inspection program

During the inspection program, the BBL pipeline is physically unable to facilitate forward flow gas flows (NL > GB) which means that the Forward Flow capacity will be technically limited at 0 GWh/h.

BBLC will inform the market in case of any further developments either before or during the inspection program period.

Latest news

27 October 2026

BBL physical flow switch to Forward Flow 28/10/2026

The BBL physical flow direction is currently in Reverse Flow mode (GB to NL). BBLC will switch the physical flow direction to Forward Flow (NL to GB) starting gas day 28 October 2026 06:00 CET and is anticipated to be finalized by 29 October 2026 06:00 CET.

Read more Arrow right icon

19 October 2026

Transition to winter time 2026

On gas day 24 October 2026 there will be a switch from summer time to winter time. This means that this gas day will have 25 hours.

Read more Arrow right icon

7 October 2026

BBL Company launches new Capacity Overview Dashboard

BBL Company (BBLC) has launched a new Capacity Overview Dashboard on its website, providing market participants with easy access to capacity information through a modern and interactive reporting tool.

Read more Arrow right icon