BBL company constructed a gas transmission pipeline (BBL) between the UK and the Netherlands which connects Balgzand and Bacton. The gas flows from the Netherlands to the UK. In December 2006, BBL Company started its commercial operation.  

Joint venture

BBL Company is a joint venture between E.ON-Ruhrgas (D), Fluxys (B) and the N.V. Nederlandse Gasunie. It constructs a 235 km long 36" high pressure gas pipeline from the Netherlands (Balgzand) to the UK (Bacton). The BBL will allow the additional import of gas from Europe to the UK, to increase security of energy supply as the country relies more heavily on imported gas from 2005.